Laserfiche WebLink
NewFields <br /> Perspective,Vision.Solutions. <br /> July 24, 2020 <br /> NewFields Project No. 475.0106.033 <br /> Cripple Creek &Victor Gold Mine Company <br /> P.O. Box 191 <br /> Victor, Colorado 80860 <br /> Attention: Steve Blaskovich <br /> Re: Valley Leach Facility 2 Phase 3 <br /> Detailed Design for Permitting, Revision 1 <br /> Cripple Creek&Victor Gold Mine <br /> Teller County, Colorado <br /> Dear Steve, <br /> This report presents the results of NewFields Mining Design &Technical Services, LLC(NewFields) <br /> Detailed Design for Phase 3 of the Valley Leach Facility 2 to be used for permitting. This revision <br /> supersedes previous version dated December 2019. <br /> If you have any questions or require additional information, please contact the undersigned. <br /> Sincerely, <br /> NewFields Mining Design &Technical Services Reviewed by: <br /> Jay N. Janney--Moore, P.E. Keith C. Williams, P.E. <br /> Project Manager O REGAS Principal <br /> ,1 T A <br /> JNM/KCW/jnm ONey'• F� <br /> (via e-mail L �;Q `3757 <br /> Ad <br /> dressee: ( a ) 0 <br /> ASS/0NAI- <br /> P:\Projects\0106.033 VLF2 Phase 3 Detailed Design\J-REPORTS\106.033-VLF2 Phase 3 Detailed Design Report-Final.docx <br /> www.NewFields.com9400 Station11 LoneCO 80124 <br />