Laserfiche WebLink
ICMC RECERTIFICATION SUMMARY AUDIT REPORT <br /> PRINCIPLE 5 - DECOMMISSIONING <br /> Protect Communities and the Environment from Cyanide through <br /> Development and Implementation of Decommissioning Plans for <br /> Cyanide Facilities <br /> Standard of Practice 5.1: Plan and implement procedures for effective decommissioning of <br /> cyanide facilities to protect human health,wildlife, and livestock. <br /> ® in full compliance with <br /> CC&v is: ❑ in substantial compliance with Standard of Practice 5.1 <br /> ❑ not in compliance with <br /> Summarize the basis for this finding: <br /> CC&V is in FULL COMPLIANCE with Standard of Practice 5.1, requiring that a decommissioning plan is <br /> developed and implemented for effective closure of cyanide facilities to protect human health,wildlife,and <br /> livestock. <br /> The operation has developed written procedures related to the decommissioning of cyanide facilities. <br /> The operation has a Mine Land Reclamation Permit that contains decommissioning procedures that are <br /> revised with each permit amendment. Each amendment address new constructions and alterations to site <br /> therefore the cyanide facilities are addressed in each amendment.The permit references previous approved <br /> rinsing criteria for WAD cyanide. <br /> There is a schedule in Volume 1 of the Permit Amendment that contains a general schedule of activities for <br /> each area, including details on reclamation as well as a table providing more details on duration. <br /> Each Newmont operation has a Closure Reclamation Life of Mine spreadsheet that includes <br /> closure/decommissioning information for each facility/landform, including cyanide facilities. <br /> A yearly cost for closure/decommissioning is listed for each facility in this spreadsheet, which is based on <br /> closure scheduling.The operation does review its decommissioning procedures during the life of the <br /> operation. Each time a Permit Amendment is submitted the operation undertakes a review of the reclamation <br /> and closure procedures listed. In addition, part of the annual review of the closure costs includes a review of <br /> the activity schedule. <br /> Standard of Practice 5.2: Establish an assurance mechanism capable of fully funding cyanide <br /> related decommissioning activities. <br /> ® in full compliance with <br /> CC&v is: ❑ in substantial compliance with Standard of Practice 5.2 <br /> ❑ not in compliance with <br /> Summarize the basis for this finding: <br /> CC&V is in FULL COMPLIANCE with Standard of Practice 5.2, requiring that operation establish an <br /> assurance mechanism capable of fully funding cyanide related decommissioning activities. <br /> The Operation has developed a cost estimate to fully fund third party implementation of the cyanide related <br /> decommissioning measures. <br /> The Operation uses the Closure Reclamation Life of Mine Spreadsheet,which includes costings for <br /> revegetation and stabilization as well as cyanide facilities.This spreadsheet is reviewed annually as part of <br /> the business processes. <br /> CC&V Mine v July 28,2017 <br /> Name of Faality Signature of Lead Auditor Date <br /> July 2017 <br /> Report No.1663584-003-R-RevO 17 (Associates <br />