My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-07_REVISION - M1980244 (11)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2020-08-07_REVISION - M1980244 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 11:59:36 PM
Creation date
8/13/2020 7:31:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
8/7/2020
Doc Name Note
Vol 2 of 2
Doc Name
Adequacy Review Response
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
JPL
ERR
BFB
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICMC RECERTIFICATION SUMMARY AUDIT REPORT <br /> of liquid cyanide at ADR1 and revised completed"NaCN Batch Record"checklists and Certificate of <br /> Cleanliness"reports for the recertification period to verify that these procedures were followed as required. <br /> CC&V has a procedure entitled"Cyanide Spillage"that defines response and actions to be taken to respond, <br /> clean up, and remediate cyanide spills during offloading. <br /> The Procedures for Cyanide Truck Unloading:Liquid Product and for Cyanide Truck Unloading: Solid detail <br /> step by step the offload procedures for Liquid cyanide and the SLS system, including the operation of all <br /> valves and couplings. <br /> CC&V has developed Procedure 2 for Personal Protective Equipment that specifies the appropriate personal <br /> protective equipment(PPE)for the driver and the reagent operator during the offload.The PPE consists of a <br /> chemical suit with rubber boots, Neoprene/Nitrite/Butyl gloves,face shield, and a portable HCN monitor.The <br /> Procedures for Cyanide Truck Unloading: Liquid Product and for Cyanide Truck Unloading:Solids require <br /> the use of the buddy system when hooking up and unhooking the ISO Container.The auditors observed <br /> during the offload at ADR1 that the CC&V reagent operator watched the driver during connections and <br /> disconnections. <br /> CC&V Mine July 28,2017 <br /> Name of Faality SignaWm of Lead Auditor Date <br /> July 2017 Golder <br /> Report No.1663584-003-R-RevO 8 As-s dates <br />
The URL can be used to link to this page
Your browser does not support the video tag.