Laserfiche WebLink
NEWMONT <br /> GOLDCORR <br /> Processing higher grade, primarily sulfide ore from surface operations will continue through the <br /> High-Grade Mill (HG Mill). Processing of ore and mineralized waste material from surface <br /> operations will continue to occur through placement of ore on VLF2 per approved Technical <br /> Revision JR) 104 (TR-104). Underground exploration of the Main Cresson Pit is anticipated to <br /> begin with the construction of a portal beginning in Q2 2020 (approved in TR-116). The current <br /> list of Technical Revisions is provided in Appendix 2. <br /> The projected mine sequencing for the Cresson Project is included in the discussions below, <br /> although it is important to note that the rate of mining as well as other timelines presented herein <br /> are approximate and depend on anticipated production rates, mining fleet, crusher availability, <br /> gold price, gold recovery, and other factors, such as fuel prices and weather conditions. As such, <br /> these approximate timelines may change and result in a shorter or a longer overall mine life. <br /> Details are provided on pre-mining activities of clearing and grubbing, mining operation <br /> development including drilling and blasting, mine area stability designs, underground <br /> development work, loading and hauling, crushing and conveying, and overburden handling. The <br /> following sections also describe the construction, surface water handling, stability of the OSAs, <br /> and mine area backfilling. Haul road and access road specifications are described for those traffic <br /> routes that are within the mining areas. <br /> Cripple Creek&Victor Gold Mining Company Exhibit D <br /> Cresson Project Amendment 13 <br /> 2 <br />