NEWMONT <br /> GOLDCORR <br /> Table D-3: Se uence of Overburden Placement and Backfill <br /> Mine Area Backfill OSA Placement <br /> GlobeMain East Cresson North Cresson <br /> Year Cresson <br /> Main Altman/ Schist <br /> Cresson ECME Wildhorse WHEX Island Hill SGOSA • <br /> 2019 X X X <br /> 2020 X X X <br /> 2021 X X X <br /> 2022 X X X <br /> 2023 X <br /> 2024 X X <br /> 2025 X <br /> 2026 X X <br /> 2027 X <br /> 2028 X X <br /> 2015- 2017- 2022- Not 2012- <br /> 2028 [Finished Finished 2026 2026 Filled 2014 2019-2028 <br /> Notes: 1. WHEX = Wildhorse Extension, Altman/ECME = East Cresson Mine Altman. 2. Actual mining <br /> schedule/sequence may vary due to changing mining or economic conditions. <br /> Mining activities and sequencing will not change from previous amendments, except for the <br /> sequence of backfilling the Schist Island Pit area with the construction of VLF2 Phase 3. Details <br /> of the VLF2 Phase 3 sequencing are provided in the Valley Leach Facility 2 Phase 3 Detailed <br /> Design Report provided in Appendix 1. Note that the annual mining and reclamation backfill <br /> progression is approximate and subject to change due to economics, weather conditions and <br /> other factors. <br /> 3.1 Clearing, Grubbing and Growth Medium Removal <br /> The VLF2 Phase 3 PSSA embankment area will require minor clearing, grubbing and growth <br /> medium removal as described in the Valley Leach Facility 2 Phase 3 Detailed Design Report <br /> included in Appendix 1. The proposed Phase 3 expansion will occur largely within already <br /> disturbed areas and is entirely within the affected lands boundary. As such, the majority of the <br /> area is already cleared and grubbed in preparation for the work. <br /> Cripple Creek&Victor Gold Mining Company Exhibit D <br /> Cresson Project Amendment 13 <br /> 9 <br />