My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-07_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2020-08-07_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 11:55:00 PM
Creation date
8/13/2020 6:45:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
8/7/2020
Doc Name Note
Vol 1 of 2
Doc Name
Adequacy Review Response
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
JPL
ERR
BFB
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEWMONT <br /> GOLDCORR <br /> 1 INTRODUCTION <br /> This Exhibit presents a description of Environmental Protection Facilities (EPFs) operating at the <br /> Cresson Project and the Environmental Protection Plan (EPP) and related documents. The <br /> purpose of the facilities and the plan are to protect areas of the mine site that have the potential <br /> to be affected by designated chemicals, toxic or acid forming materials, or acid mine drainage. <br /> This Exhibit U satisfies Part 6.4.21 of the Hard Rock/Metal Mining Rule. <br /> The Cresson Project is a Designated Mining Operation (DMO) as defined by Section 1.1(14)(a) <br /> and (b) of the Hardrock /Metal Mining Rule, because of both the use of designated chemicals in <br /> the metallurgical processing areas, and the potential for toxic or acid forming materials to be <br /> exposed or disturbed as a result of mining operations. <br /> The information contained in this EPP includes: <br /> • A description of the designated chemicals used in the metallurgical processes; <br /> • A summary of the EPFs at the Site; <br /> • A summary of prior studies used to identify acid generating potential and the processes <br /> used to control acid mine drainage; and <br /> • The Emergency Response Plans (ERPs) used to respond to an environmental incident <br /> should one occur. <br /> Environmental protection is a foundation of operations for the Cripple Creek&Victor Gold Mining <br /> Company (CC&V). The Cresson Project has an Environmental Management System, which is <br /> independently certified under the International Standards Organization (ISO) 14001:2015 <br /> standard. Furthermore, the operation has been re-certified under the voluntary International <br /> Cyanide Management Institute (ICMI) through a third-party recertification audit that occurred in <br /> 2017. A copy of the most recent International Cyanide Management Code (Code) Audit report <br /> may be found on the ICMI's website at the following link. <br /> https://www.cyanidecode.org/sites/default/files/pdf/NewmontCCVSAR2017.pdf <br /> Cripple Creek&Victor Gold Mining Company Exhibit U <br /> Cresson Project Amendment 13 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.