Laserfiche WebLink
NEWMONT <br /> GOLDCORR <br /> ■ Geomembrane Fusion Destructive Testing Summary <br /> ■ Geomembrane Extrusion Destructive Testing Summary <br /> o Geomembrane Pressure Testing Summary <br /> o Geomembrane Defect/Repair Summary <br /> • Third Party Geomembrane Conformance Testing Results <br /> Will be included as part of CQA Report when these features are included as part of approved design <br /> stamp Drawing or Report Sections that require a PE or PLS Stamp <br /> Cripple Creek&Victor Gold Mining Company Exhibit U <br /> Cresson Project Amendment 13 <br /> 22 <br />