Laserfiche WebLink
NEWMONT <br /> GOLDCORR <br /> ■ Drain Cover Fill <br /> o Geomembrane Construction Quality Assurance <br /> ■ Geomembrane Third Party Conformance Testing <br /> ■ Geomembrane Panel Deployment <br /> ■ Geomembrane Fusion Seaming <br /> ■ Geomembrane Extrusion Seaming <br /> ■ Geomembrane Destructive Testing <br /> ■ Geomembrane Pressure Testing <br /> ■ Geomembrane Defects and Repairs <br /> ■ Geomembrane Acceptance <br /> • PROJECT DEVIATIONS <br /> • ENGINEER'S OPINION stamp <br /> ISSUED FOR CONSTRUCTION DRAWINGS <br /> • COVER SHEET stamp <br /> • PROJECT SITE PLAN VIEW stamp <br /> • EXISTING SITE CONDITIONS stamp <br /> • GRADING PLAN stamp <br /> • GRADING PLAN ISOPACH stamp <br /> • LINER LIMITS stamp <br /> • VALLEY LEACH FACILITY SECTIONS AND DETAILS SHEET stamp <br /> • UNDERDRAIN DETAIL SHEET stamp * <br /> • LEAK DETECTION & EROSION CONTROL DETAILS stamp <br /> • SOLUTION CONCENTRATION PIPING LAYOUT stamp <br /> • SOLUTION COLLECTION SYSTEM DETAILS stamp <br /> RECORD OF CONSTRUCTION DRAWINGS <br /> • TOP OF SOIL LINER FILL AS-BUILT stamp <br /> • UNDERDRAIN AS-BUILT stamp * <br /> • SOLUTION COLLECTION SYSTEM AS-BUILT Stamp * <br /> • LEAK DETECTION TRENCH AS-BUILT stamp * <br /> • GEOMEMBRANE PANEL LAYOUT AS-BUILTstamp <br /> • DRAIN COVER FILL AS-BUILT ISOPACH stamp <br /> LIST OF TABLES <br /> Cripple Creek&Victor Gold Mining Company Exhibit U <br /> Cresson Project Amendment 13 <br /> 20 <br />