Laserfiche WebLink
NEWMONT <br /> GOLDCORR <br /> Using the hydrologic and geochemical information developed for the District, an evaluation was <br /> conducted of the fate and transport of water infiltrating to the subsurface through mines, mine <br /> backfill, and OSAs. The results of the analysis were verified by checking against the observed <br /> behavior of the hydraulics and chemistry of the diatreme since Cresson Project surface mining <br /> began in 1993, using the measured vertical hydraulic gradients in and near the diatreme, and the <br /> flow rate and chemistry of the regional groundwater exiting the Carlton Tunnel portal. The results <br /> of the analysis indicate that no deleterious change in the average regional groundwater quality <br /> from the District will occur due to past, current or proposed operations. <br /> Cripple Creek&Victor Gold Mining Company Exhibit U <br /> Cresson Project Amendment 13 <br /> 17 <br />