My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-02_PERMIT FILE - C1981019A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2020-07-02_PERMIT FILE - C1981019A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:04:52 AM
Creation date
8/13/2020 6:04:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
7/2/2020
Doc Name
Volume 1 Rule 4
Type & Sequence
TR136
Section_Exhibit Name
4.01 Through 4.30
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br /> complete the entire South Taylor Pit will be backfilled and the pre-mine profile and function of <br /> the upper reaches of Taylor Creek will be restored. <br /> One best management practice structure (sediment sump) lies within the stream buffer zone on <br /> Taylor Creek. This structure manages storm water runoff from the haul road and provides a <br /> benefit to Taylor Creek by capturing stormwater runoff from the haul road. This structure is not <br /> anticipated to have any impacts to Taylor Creek, and provides a benefit in protecting stormwater <br /> runoff to Taylor Creek. <br /> The Taylor Pump Holding Pond was constructed within 100' of Taylor Creek. The Taylor Pump <br /> Holding Pond is utilized to manage water movement from Wilson Reservoir to the active <br /> operation;therefore, an underground water pipeline that transports water to and the from the <br /> Taylor Pump Holding Pond was also constructed at various locations within 100' of Taylor <br /> Creek as shown on Map 10C. Neither of these structures has impacted Taylor Creek, and neither <br /> structure is expected to have any long term impacts to Taylor Creek. <br /> A water diversion structure is constructed in Taylor Creek that allows Colowyo to divert water <br /> from Taylor Creek to exercise a water right. This structure would be utilized even if mining was <br /> not occurring at Colowyo, as Colowyo is the private surface landowner utilizing a privately held <br /> water right structure. <br /> A light use road that was a premine "ranch"road follows along Taylor Creek. This road is <br /> utilized to access the West Pit, East Taylor, and West Taylor sediment ponds. The road has been <br /> improved upon from its premine condition to allow equipment access for dredging activities and <br /> continued environmental monitoring. The lower reach of the road where it begins off of the <br /> paved haul road up to the East Taylor Pond, snakes in and out of the 100' stream buffer zone off <br /> of Taylor Creek. The upper reach from the East Taylor Pond to the West Taylor Pond is almost <br /> exclusively within the 100' stream buffer zone due to steep topography. To date this road has <br /> not created any adverse impacts to Taylor Creek, and it is not anticipated to have any long term <br /> impacts to Taylor Creek. <br /> The raw water pipeline to the Collom operation will be routed across Taylor Creek through an <br /> elevated structure. An elevated structure minimizes impacts within the stream buffer zone versus <br /> other routing options such as boring the pipeline under Taylor Creek, which requires large <br /> trenches and greater ground disturbances for equipment to bore under both sides of Taylor <br /> Creek. With the elevated structure small disturbances will occur within the stream buffer zone of <br /> Taylor Creek. Prior to ground disturbing activities proper best management practices (silt fence <br /> or other suitable sediment control measures) will be installed. Topsoil will be windowed and <br /> concrete footers will be poured which will provide the base for the structural stability needed to <br /> support the pipe over Taylor Creek. Once the pipe and structure steel is installed the limited <br /> disturbance areas have the topsoil windrows spread back out and the areas will be seeded. <br /> Sediment will be controlled during the construction of these structures and will negate any <br /> impacts to Taylor Creek while the ground is disturbed. The sediment control structures will be <br /> left in place after reclamation until a suitable vegetative cover has been achieved. The water <br /> pipe line and associated infrastructure will not create any long term impacts to Taylor Creek. <br /> Rule 4 Performance Standards 4-20 Revision Date: 12/20/19 <br /> Revision No.: TR-135 <br />
The URL can be used to link to this page
Your browser does not support the video tag.