My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-27_PERMIT FILE - M2019031
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019031
>
2020-07-27_PERMIT FILE - M2019031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 7:27:46 AM
Creation date
8/12/2020 7:45:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019031
IBM Index Class Name
PERMIT FILE
Doc Date
7/27/2020
Doc Name
Issuance/Final Decision Documents
From
DRMS
To
Atlas Mining
Email Name
LJW
JXT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
be able to comply with the requirements of the Act and applicable rules and regulations of the Board, <br /> the Permittee hereby agrees to exercise its best efforts, after consulting with the Division, to modify <br /> the plans to correct such deficiencies in the future. Such modifications may require technical <br /> revisions or amendments to the permit. <br /> 4) The Board or its authorized representative may enter upon the lands of the permitted operation at all <br /> reasonable times for the purpose of inspection to determine whether the provisions of the Act,Rules <br /> and Regulations,and permit have been complied with pursuant to C.R.S.34-32-121. <br /> 5) This permit may be revoked or suspended for non-compliance with the Act or applicable rules or <br /> regulations promulgated by the Board,the permit,or by violation of a Board Order. <br /> 6) a) Pursuant to 34-32-118(5) of the Act,the Board has a right of entry to reclaim the lands affected <br /> by the operation or to respond to an emergency where the Division determines that any of the <br /> conditions of C.R.S. 34-32-124.5 exist. <br /> b) The Board will enter the lands to perform reclamation only if the Board has determined that: <br /> i. Reclamation required by the permit, statute, or regulations to be performed upon such lands <br /> has not been performed,or <br /> ii. Financial warranty forfeiture proceedings described in the Act or similar provisions of <br /> subsequent laws,if any,have been initiated. <br /> c) The Division, acting for the Board, will enter lands to respond to an emergency only where the <br /> Division determines that any of the conditions of Construction Material Rule 8.4.2 exist. <br /> 7) The additional conditions set forth in the attached rider,if any,are incorporated herein by reference. <br /> a) Rider is attached. <br /> / XX / b) No rider is attached. <br /> MINED LAND RECLAMATION BOARD <br /> COLORADO DEPARTMENT OF NATURAL RESOURCES <br /> Virginia Brannon <br /> Division Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.