My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-11_PERMIT FILE - M2020035 (10)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020035
>
2020-08-11_PERMIT FILE - M2020035 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 8:31:53 PM
Creation date
8/12/2020 6:31:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020035
IBM Index Class Name
PERMIT FILE
Doc Date
8/11/2020
Doc Name
Application
From
Elam Construction
To
DRMS
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Reclamation Timing <br /> Stormwater berms will be seeded within 90 days of their construction using the permanent <br /> rangeland mixture. All reclamation activities will be completed within two years of the <br /> completion of mining activities onsite. <br /> Table E-4 summarizes the timing of reclamation throughout the life of the mine. The anticipated <br /> timing is based on a five year mine life, depending on market conditions. If the mine life is <br /> extended,the appropriate years will be added to the timeline to accommodate reclamation. <br /> Table E-4. Reclamation Timetable <br /> Years Activity <br /> 1 Stripping of initial mining area <br /> 1 Mining of pit, beginning in the south and progressing north <br /> __--.__ _ <br /> 1-4 Reclaim slopes to rangeland as mining progresses north <br /> 4 Removal of all portable equipment,fuel tanks, and pumpset and reclamation of remaining <br /> disturbed areas <br /> 4-5 Revegetation monitoring <br /> 5. Post-Reclamation Site Drainage <br /> Map F-1 shows blue arrows indicating the approximate direction of drainage throughout the site <br /> within the affected area. Map G-1 shows the post mine drainage conditions in comparison to <br /> baseline and mining conditions. <br /> 6. Weed Control <br /> Measures will be employed for the control of noxious weeds. A Weed Control Plan will be <br /> utilized as follows: <br /> 1) Every April and October, a weed survey will be taken of the affected area to identify and <br /> map the presence of any noxious weeds listed by the county and the state. <br /> 2) If any patches or plants are identified,they will be controlled within 30 days. This may <br /> include mowing, tillage, or spraying them with an herbicide approved for use by the weed <br /> control staff of Mesa County. Other methods of weed control (ie: biological)may be <br /> employed from time to time depending on the nature and extent of the targeted species. <br /> 23 114 West <br /> July 2020 E-5 Greg t ewicki and.Associates PI.1.(' <br />
The URL can be used to link to this page
Your browser does not support the video tag.