Laserfiche WebLink
EXHIBIT L - Reclamation Costs Estimate <br /> Reclamation cost for the proposed new disturbance area is derived from Table 1.3 on page 5 of the American Gypsum PoO. <br /> Cost of <br /> TO P543 AL ��1� ��� ���' <br /> Location Acres LCY Haul Hr& Topsoil Dozer1Hrs Work and Slash Total Cost <br /> Topsoil <br /> East Pit+ Road 35.4 0.25 I03,334 1,307 $ 134,399 1,188 $ 75,3I5 $ 396,803 $686,516 <br /> Upper Pit Expansion+ Road 11.8 0.25 14,278 181 $ 18,570 164 $ 10,406 54,828 $ 83,804 <br /> Growth Medium Stockpile 1.1 0.25 1'331 17 $ 1'731 15 $ 970 5,121 $ 7,812 <br /> Total <br /> s� <br />