Laserfiche WebLink
3~7 Revegetation <br /> /\reoe disturbed during proposed mining activities vvnu|d be regreded, treck-vva|ked, and <br /> hydroseeded according to previous approvals(BILM, 2019) using an approved and certified weed- <br /> free seed mix. No seeding would occur until seed tags and Or/Oth8rnffioia| documentation of the <br /> correct seed mix are submitted and approved by the BLM (BLK4. 2013). Table 3.2 lists the <br /> proposed seed mixture, including application rate in pounds per acre (Iblac). <br /> TABLE 3'2: PROPOSED SEED MIXTURE <br /> CO/UT source preferred or Anatone, GoIdar 2.8 <br /> 2.5 <br /> Indian ricegrass White River(preferred)or Palorna or Nezpar Z5 <br /> Sandberg bluegrass UP CO (preferred)or High Plains or VNS 0.4 <br /> Muttongrass Ruin Canyon (preferred)or VNS 0.3 <br /> 0.25 <br /> Approved ferfi|izera (BLK8. 2016) may be used but are not anticipated based on previous <br /> experience. <br /> Ravegetation success will be determined and monitored according to the BLM Northwest <br /> Colorado District Recommended Outline for Surface Reclamation Planning (BLK3. 2013) uaing <br /> current methods (USDA. 2017). An Annual Reclamation Report would be submitted by <br /> 31 December each year. If reveQetadon is not successful or making progress toward meeting <br /> successful revegetadonoriteria by the third growing nemson, additional action would betaken <br /> such as reseeding or adding oui| amendments. Historically, there have been areas where <br /> revegetation attempts have not been successful, but the reclaimed surface does not erode and <br /> does not allow weed growth. Similar Surfaces may be encountered during reclamation activities <br /> for the proposed Modification and vvOu!d be inspected annually for signs of erosion or weed <br /> growth. If conditions change, additional revegetation efforts may be implemented. <br /> 3~8 Deleterious Materials <br /> Gypsum iG processed into wallboard directly at the plant; there are nO on-site processing facilities <br /> and therefore no processing uhennino|o or acid-producing, bzxic, or deleterious materials used or <br /> stored atthe Mine. <br /> 3-9 Buildings, Structures, and Support Facilities <br /> No new bui|dingD, struotureo, or support facilities would be constructed as pad Of the mining <br /> activities described herein. Rec|enlsd|on activities for existing support facilities are included in <br /> previous permit applications. Table 3.3 summarizes existing buildings and foundations at the Mine <br /> Office and staging area. All buildings are located on land managed by the BLM. <br /> 33 <br />