My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-10_PERMIT FILE - M1984041
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1984041
>
2020-08-10_PERMIT FILE - M1984041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2025 7:41:04 AM
Creation date
8/11/2020 8:50:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984041
IBM Index Class Name
PERMIT FILE
Doc Date
8/10/2020
Doc Name
Adequacy Review - Preliminary
From
American Gypsum
To
DRMS
Email Name
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Unpatented <br /> Unpatented <br /> Note: m Claims are within permitted disturbance limits <br /> (BLIN. 2D02; CODRIVI8.2OO1). <br /> American Gxoaunn would maintain all right, UUe. 8ndinteremtinandhoeechofthe claims included <br /> ao part of this Plan ofOperations. <br /> American Gypsum's use of public lands involves the continued use of roads and the maintenance <br /> of gates, fences, and signs. |n accordance with 43CFR § 3715. Table 2.O documents structures <br /> on public lands that are reasonably incident to American Gypsum's mining activities. [)navvingo 03 <br /> and 15 show the detailed locations of surface facilities. <br /> TABLE 2'6: FACILITIES oNPUBLIC LANDS <br /> I Mine access arid haul roads Drawing 03 Duration of mine life See reclamation plan <br /> Mine entrance gate Drawing 03 Duration of mine life See reclamation plan <br /> Drawings 03 and <br /> Shop and office facilities Duration of mine life See reclamation plan <br /> Through initial <br /> I Growth medium stockpile Drawing 03 See reclamation plan <br /> reclamation <br /> Mine pits Drawing 03 Duration of operations See reclamation plan <br /> t Equipment staging areas Drawing 15 Duration of mine life See reclamation plan <br /> 2~12 Hazmat <br /> Gypsum is processed into wallboard directly etthe plant; there are no on-site processing facilities <br /> and therefore no processing chemicals oracid-producing rneteri3|S used or stored at the Mine. <br /> Hazardous materials would riot be stored within the proposed disturbance area. Spills vvOuid be <br /> reported and managed according to American 8yp8Onn'm Spill Pr8ventiOn, Contno{, arid <br /> Countermeasure(SP{}C) Plan (Environmental Solutions, 201S). <br /> 2~13 Rock Characterization and Handling Plans <br /> During dhU|ng, material was classified as "gypsum" or ''vv8ate~ (intnaburUen). characterizing <br /> intnabumden as material with |emo than 8596 gypsum. During active rnining, material is <br /> characterized aS gypsum orintrabu;den based on visual observations. <br /> 2'13'1 Materials Characterized <br /> Table 2.7 lists materials characterized, and method used for characterization. <br /> z� <br />
The URL can be used to link to this page
Your browser does not support the video tag.