My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-10_PERMIT FILE - M1984041
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1984041
>
2020-08-10_PERMIT FILE - M1984041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2025 7:41:04 AM
Creation date
8/11/2020 8:50:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984041
IBM Index Class Name
PERMIT FILE
Doc Date
8/10/2020
Doc Name
Adequacy Review - Preliminary
From
American Gypsum
To
DRMS
Email Name
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for road construction will consist of intraburden/overbuodenfnorn the Upper Pb and East Pit <br /> development. Drawings OO and 07 show the Upper Pit and East Pb Access Roads just priorho <br /> East Pit development. [}r8vvng 08 shows the East Pit Access Road configuration sdthe end of <br /> East Pit development. <br /> 2.6-2 Haul Routes <br /> According to existing perrnits, roads are two lanes, and tn8f5o patterns fO||Ovv right-hand traffic <br /> conventions (except for the existing minor site access roads used for rnaintenancH, overburden <br /> nenlove|, and progressive reclamation activities). No new minor site access roads would be <br /> needed under this proposed Modification. <br /> For the proposed Modification,trucks would carry gypsum from the Upper Pit to the new 0.08-mile <br /> long access road (vveat). LO the remaining 0.06-mile long section of the Upper Pit @AOO Road <br /> (vvest) (BLK4. 2OMC{} [)RMS. 201Sa). tothe existing haul road /xvest. then mouth\. to Trail Gulch <br /> Road (south), CrOSS over 1-70. and continue southeast on Highway to American Gypsum's <br /> vvo|/boond plant. The total haul route would bg approximately 3.17 miles from the western edge of <br /> the Upper Pit and 3.49 miles from the western edge of the East Pit (internal pit roads excluded). <br /> 2'6.3 Other Utilities <br /> The Mine Office would remain in its current location north of the Lower Pit. The Mine Office is a <br /> temporary building; there one no power or water lines to the site. No additional utilities such as <br /> povver, vveter, or communication lines are anticipated within the proposed disturbance area. <br /> Power to the Mine Office is provided bye Multi Quip 70-ki|ovvatt(hvv) generator(Table 2.2). <br /> 2~7 Equipment <br /> Table 2.2 lists anticipated equipment used during the motive mine life and reclamation. <br /> TABLE 2.2: ANTICIPATED EOU|PANENTBY PHASE <br /> Operational— Upper Pit <br /> Current operating pit <br /> Current oporating pit <br /> Front End Loader Current operating pit CAT 980 2 2017, 2007 <br /> Tracked Excavator Staging Area CAT 328DL 1 2014 <br /> Truck/7raHer with <br /> Staging Area <br /> Bottom Dump <br /> Truck[Trailer with <br /> Bottom Dump <br /> Articulated Dump <br /> Truck <br /> 1e <br />
The URL can be used to link to this page
Your browser does not support the video tag.