in e manner appropriate to water conditions encountered during drilling. Potential <br /> drilling areas are identified On Drawing OO; and <br /> Develop the new East Pit, including removing an average overburden depth of 20 feet. <br /> The East Pit would be excavated toon anticipated pit floor elevation Of0ROO feet amno| <br /> as shown on Drawings 08 and 09. Additional drilling may be required to further explore <br /> the gypsum depth (potential drilling areas shown on Drawing OD). Drilling permits <br /> (including drill hole Plugging and reclamation) would be obtained prior to drilling and <br /> drill holes would be plugged in a manner appropriate to water conditions encountered <br /> during drilling. <br /> Material hauling: <br /> Haul gypsum to American Gypsum's wallboard plant or existing on-site stockpiles; <br /> Haul overburden and intnaUurden to new road construction areau, on-site otonage, or to <br /> inactive pit areas for progressive reclamation; and <br /> Haul iOtnabundeO to in-pit storage areas (inactive 3r88S of the pits) and maintaining <br /> stockpiles. <br /> Progressive(or concurrent)reclamation (Drawings O6 andO8): <br /> BmcKfi|| inactive pit areas with overburden and intnabumdento 2.5H:1Vover8i| o|Opee <br /> where possible. <br /> Final reclamation (Drawings 11 throuQh13`: <br /> Regnadeany areas within the Upper Pit, East Pit. or 8CC88S roads associated with the <br /> proposed disturbance area (listed above)to 2.5H�W slopes or flatter, achieving 3H:1V <br /> vvhena possible; <br /> Remove Culverts and associated hpnap collars/aprons through road or000inga, including <br /> excavating road fill to pre-construction topography to expose culverts, re-establishing <br /> natural drainages at pre-construction grades, and regrading remaining road fill to <br /> 2.5H:1Voroha||ovvec <br /> . <br /> Install riprap or other erosion protection measures where necessary (such as re- <br /> established native drainage ch@nne|s); and <br /> RevegetatediSturbed areas. <br /> Drawing 04 shows types and locations of disturbance associated with the proposed Modification. <br /> 2.3 Period of Operation <br /> Mining in the Upper Pit is ongoing: based on current mining rates (approximately 500.000tpy)' <br /> mining in the Upper Pit can continue to support American Gypsum's wallboard plant needs for an <br /> additional 15 to 25 years (depending on the quality of gypsum encountered). For the East Pit, <br /> clearing and grubbing/overburden namoove| is anticipated to begin in 2021. The East Pit is <br /> expected to Support mining activities for an additional 26 years (duration may vary depending on <br /> the quality[f gypsum enCountered). <br />� 15 <br />