Laserfiche WebLink
<br />CC&V Wildlife Protection Plan <br /> <br />S&ER <br /> <br /> Department THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT Doc Id: NNA-CCV-ER-Plan - E_042 <br /> CCV S&ER Date of This Issue: 2/20/2019 Date of Next Review: 2/20/2022 Page 2 of 13 <br /> <br />Table of Contents <br />1 Introduction ..................................................................................................................................................................................................... 2 <br />2 Preventive Measures within Respective Areas of Activity ............................................................................................................... 3 <br />2.1 Lined Ponds .......................................................................................................................................................................................... 3 <br />2.2 Active Leaching or Process Facilities – (>50 ppm cyanide concentration) .................................................................... 3 <br />2.3 Mine Area and Other Excavations or Disturbances ................................................................................................................ 3 <br />2.4 Haul Roads and Access Roads ....................................................................................................................................................... 4 <br />2.5 Buildings and Administrative Areas ............................................................................................................................................. 4 <br />2.6 Property-Wide Considerations....................................................................................................................................................... 4 <br />3 Maintenance and Inspections of Preventive Measures .................................................................................................................... 5 <br />3.1 Inspections ............................................................................................................................................................................................ 5 <br />3.2 Maintenance ......................................................................................................................................................................................... 5 <br />4 Legacy Considerations ................................................................................................................................................................................. 5 <br />4.1 Reclamation .......................................................................................................................................................................................... 5 <br />4.2 Biodiversity ............................................................................................................................................................................................ 6 <br />4.3 Sustainability ........................................................................................................................................................................................ 6 <br />5 Reporting Wildlife Findings ........................................................................................................................................................................ 6 <br />5.1 Injured or Sick Wildlife ..................................................................................................................................................................... 6 <br />5.2 Wildlife Mortalities ............................................................................................................................................................................. 6 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1 Introduction <br />All aspects of the Cripple Creek and Victor gold mining Company’s (CC&V) operations shall take into account the <br />safety and protection of wildlife on the mine site, at processing sites, and along all access roads to the mine site.