My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-03_REVISION - M1980244 (11)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2020-08-03_REVISION - M1980244 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2020 9:44:20 AM
Creation date
8/10/2020 8:31:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
8/3/2020
Doc Name
Adequacy Review - Preliminary
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
ERR
JPL
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICMC RECERTIFICATION SUMMARY AUDIT REPORT <br /> <br />CC&V Mine <br />Name of Facility __________________________________ <br />Signature of Lead Auditor <br />July 28, 2017 <br />Date <br />July 2017 <br />Report No. 1663584-003-R-Rev0 3 <br /> <br />3.0 SUMMARY AUDIT REPORT <br />3.1 Auditors Findings <br />CC&V is: <br /> in full compliance with The International <br />Cyanide Management <br />Code <br /> in substantial compliance with <br /> not in compliance with <br />This operation has experienced four minor cyanide incidents during the previous 3-year audit cycle, which <br />are discussed in this report under Standard of Practice 9.3. <br />Audit Company: Golder Associates Inc. <br />Audit Team Leader: Jaclyn Ennis-John, Lead Auditor and Technical Specialist <br />Email: jennis-john@golder.com <br />Name of Other Auditors <br />Name, Position Signature <br />Ivon Aguinaga, Technical Specialist <br /> <br />Dates of Audit <br />The Recertification Audit site visit was conducted over four days between 20 and 23 March 2017. <br />I attest that I meet the criteria for knowledge, experience and conflict of interest for Code Verification Audit <br />Team Leader, established by the International Cyanide Management Institute and that all members of the <br />audit team meet the applicable criteria established by the International Cyanide Management Institute for <br />Code Verification Auditors. <br />I attest that this Summary Audit Report accurately describes the findings of the verification audit. I further <br />attest that the verification audit was conducted in a professional manner in accordance with the International <br />Cyanide Management Code Verification Protocol for Cyanide Gold Mine Operations and using standard and <br />accepted practices for health, safety, and environmental audits. <br /> <br />CC&V Mine <br />Name of Facility <br />__________________________________ <br />Signature of Lead Auditor <br />July 28, 2017 <br />Date
The URL can be used to link to this page
Your browser does not support the video tag.