My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-03_REVISION - M1980244 (11)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2020-08-03_REVISION - M1980244 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2020 9:44:20 AM
Creation date
8/10/2020 8:31:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
8/3/2020
Doc Name
Adequacy Review - Preliminary
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
ERR
JPL
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICMC RECERTIFICATION SUMMARY AUDIT REPORT <br /> <br />of liquid cyanide at ADR1 and revised completed “NaCN Batch Record” checklists and Certificate of <br />Cleanliness” reports for the recertification period to verify that these procedures were followed as required. <br />CC&V has a procedure entitled “Cyanide Spillage” that defines response and actions to be taken to respond, <br />clean up, and remediate cyanide spills during offloading. <br />The Procedures for Cyanide Truck Unloading: Liquid Product and for Cyanide Truck Unloading: Solid detail <br />step by step the offload procedures for Liquid cyanide and the SLS system, including the operation of all <br />valves and couplings. <br />CC&V has developed Procedure 2 for Personal Protective Equipment that specifies the appropriate personal <br />protective equipment (PPE) for the driver and the reagent operator during the offload. The PPE consists of a <br />chemical suit with rubber boots, Neoprene/Nitrile/Butyl gloves, face shield, and a portable HCN monitor. The <br />Procedures for Cyanide Truck Unloading: Liquid Product and for Cyanide Truck Unloading: Solids require <br />the use of the buddy system when hooking up and unhooking the ISO Container. The auditors observed <br />during the offload at ADR1 that the CC&V reagent operator watched the driver during connections and <br />disconnections. <br />CC&V Mine <br />Name of Facility __________________________________ <br />Signature of Lead Auditor <br />July 28, 2017 <br />Date <br />July 2017 <br />Report No. 1663584-003-R-Rev0 8
The URL can be used to link to this page
Your browser does not support the video tag.