My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-03_REVISION - M1980244 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2020-08-03_REVISION - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2020 9:44:19 AM
Creation date
8/10/2020 8:31:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
8/3/2020
Doc Name Note
Exhibit E
Doc Name
Adequacy Review - Preliminary
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
ERR
JPL
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Cripple Creek & Victor Gold Mining Company Exhibit E Cresson Project Amendment 13 5 <br />Where practicable, portions of the current perimeter fence will be left in place and the eight-foot high fence will be tied into these existing sections. Fences will be placed to control access to the crest and toe of highwall benches. Signs will be placed along the fencing to warn the general public of the hazard of the highwall after reclamation, as appropriate. <br />Wildlife ingress and egress will be provided along the final reclaimed haul road routes. Remaining highwall benches will act to catch rocks, and will, over time become at least partially covered with rock falls from above and will form talus slopes for wildlife habitat. As a result, no revegetation of highwall benches is planned.
The URL can be used to link to this page
Your browser does not support the video tag.