My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-03_REVISION - M1980244 (8)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2020-08-03_REVISION - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2020 9:44:19 AM
Creation date
8/10/2020 8:29:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
8/3/2020
Doc Name Note
Exhibit D
Doc Name
Adequacy Review - Preliminary
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
ERR
JPL
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Cripple Creek & Victor Gold Mining Company Exhibit D Cresson Project Amendment 13 11 <br />38 E Grassy Valley 77 <br />39 E + Ames warehouse area 224 <br />CT E Located at Carlton Tunnel 2 <br />Estimated Total Existing Inventory 2,997 <br />*Stockpile will or does provide visual and noise berm <br />Stockpiles consolidated or used in reclamation since A11 approval (removed from table): 10, 10a, 14, <br />20, 21, 30 <br />Growth medium is stored to depths and slopes appropriate for access for placement and removal, erosional stability, and minimization of the footprint to limit additional disturbed area. Growth medium storage areas, when in place for more than one year and with no further development at the storage areas planned, are seeded with the same or a similar seed mix approved by DRMS for use in reclamation (see Reclamation Plan provided in Exhibit E). The seed mix may emphasize annuals if the storage area is anticipated to be moved within approximately two years (see Table J-1 and Exhibit J). <br />If necessary, erosion control structures, run-on diversion ditches, or equivalent structures designed for two times the 10-year, 24-hour precipitation event will be constructed up-gradient of growth medium areas for protection. A more complete discussion of water and sediment control from stormwater runoff is contained in Exhibit U. <br />3.2 Mining Areas, Operations, and Equipment <br />Surface mining and backfilling will continue in the previously approved areas, predominantly in North Cresson Mine area, and East Cresson Mine area. Each mine area is shown on Drawing C-4a. <br />Surface mining will continue to use conventional mining excavation methods as presently being conducted at the Cresson Project. Overburden and ore will be mined using conventional production blasting, loaded into haul trucks with hydraulic shovels or front-end loaders, and hauled to the appropriate location. The mine areas will be developed by constructing a series of benches. The height and the width of the benches will vary depending on the local geology, stability of the wall material, and mining needs. <br />Table D-5 presents the anticipated equipment list for surface mining activities.
The URL can be used to link to this page
Your browser does not support the video tag.