My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-03_REVISION - M1980244 (8)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2020-08-03_REVISION - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2020 9:44:19 AM
Creation date
8/10/2020 8:29:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
8/3/2020
Doc Name Note
Exhibit D
Doc Name
Adequacy Review - Preliminary
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
ERR
JPL
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Cripple Creek & Victor Gold Mining Company Exhibit D Cresson Project Amendment 13 9 <br />Table D-3: Sequence of Overburden Placement and Backfill <br />Year <br />Mine Area Backfill OSA Placement <br />Main <br />Cresson East Cresson North Cresson <br />Main <br />Cresson <br />Altman/ <br />ECME Wildhorse WHEX Schist <br />Island <br />Globe <br />Hill SGOSA ECOSA <br />2019 X X X <br />2020 X X X <br />2021 X X X <br />2022 X X X <br />2023 X <br />2024 X X <br />2025 X <br />2026 X X <br />2027 X <br />2028 X X <br /> 2015-2028 Finished Finished 2017-2026 2022-2026 Not Filled 2012-2014 2019-2028 <br />Notes: 1. WHEX = Wildhorse Extension, Altman/ECME = East Cresson Mine Altman. 2. Actual mining schedule/sequence may vary due to changing mining or economic conditions. <br />Mining activities and sequencing will not change from previous amendments, except for the sequence of backfilling the Schist Island Pit area with the construction of VLF2 Phase 3. Details of the VLF2 Phase 3 sequencing are provided in the Valley Leach Facility 2 Phase 3 Detailed <br />Design Report provided in Appendix 1. Note that the annual mining and reclamation backfill progression is approximate and subject to change due to economics, weather conditions and other factors. <br />3.1 Clearing, Grubbing and Growth Medium Removal <br />The VLF2 Phase 3 PSSA embankment area will require minor clearing, grubbing and growth medium removal as described in the Valley Leach Facility 2 Phase 3 Detailed Design Report included in Appendix 1. The proposed Phase 3 expansion will occur largely within already disturbed areas and is entirely within the affected lands boundary. As such, the majority of the area is already cleared and grubbed in preparation for the work.
The URL can be used to link to this page
Your browser does not support the video tag.