Laserfiche WebLink
Exhibit F - Reclamation plan map <br /> k . <br /> Nelson Pit <br /> Limited Access <br /> --�--- Highway <br /> Major Road <br /> Local Road <br /> Minor Road <br /> t ! Other Road <br /> Ramp <br /> NAIP Image <br /> 1,.'� RGB <br /> �-� Red Band_1 <br /> - Green: Band_2 <br /> Blue: Band_3 <br /> �i OF � Nelson Pit <br /> r Pit Entrance <br /> 4200 J'JV <br /> Feet <br /> Using topsoil from the stockpiled overburden pile which was stockpiled along the East of the permitted area.Sides will be sloped towards the creek bed at a minimum of 3:1 hori- <br /> zontal to vertical slope.Topsoil will be used to cover the slope at a depth of no less than 6 inches up to 12 inches in depth.Seeding will be done during the fall.The seed bed will <br /> be drilled in.Cow Manure will be used for fertilizer,spread at the rate of at least 20 tons per acre. <br />