Laserfiche WebLink
TRAPPER MINE <br /> RECLAIMED PARCEL HISTORY <br /> Parcel Designation: L-AB-19 Acreage: 117.8 <br /> Reclamation Year(s) of <br /> Activity Occurrence Comments <br /> Regrade 2019 <br /> Topsoil Replacement 2019 Depth (inches): 14.0, 13.3 <br /> How Measured: Load Counts, DRMS <br /> Topsoil Origin: Stockpile X Livehaul <br /> Topsoil from piles K2-15 (74,320 bcy), 19-1 <br /> (49,477 bcy) and 18-5 (39,146 bcy). Livehaul <br /> was 58,770 bcy. <br /> Seedbed Preparation 2019 Dragging Disking ❑ Other X (explain) <br /> Motor Grader (Blade) <br /> Fertilization N/A Product Used: <br /> Rate: <br /> Seed Mixture(s) 2019 Refer to Table(s) Range Site AB; Aerial <br /> Drill seeded in Fall 2019; Aerial seeded in <br /> Spring 2020. <br /> Bond Release Phase I Phase II Phase III <br /> Application # SL-21 <br /> Approval Date <br /> Comments: DRMS topsoil depth sampling verified with inspection reports of September <br /> and October 2019. <br /> M:\RECLMHS <br />