Laserfiche WebLink
TRAPPER MINE <br /> RECLAIMED PARCEL HISTORY <br /> Parcel Designation: F-B-19 Acreage: 78.9 <br /> Reclamation Year(s) of <br /> Activity Occurrence Comments <br /> Regrade 2019 Reconstructed drainage corridor. <br /> Topsoil Replacement 2019 Depth (inches): 14.0, 12.6 <br /> How Measured: Load Counts; DRMS <br /> Topsoil Origin: Stockpile X Livehaul x <br /> Note: Topsoil from piles A96-1 (52,612 bcy), <br /> A98-2 (50,738 bcy) and A97-2 (23,004 bcy). <br /> Live haul was 15,555 bcy. <br /> Seedbed Preparation 2019 Dragging Disking ❑ Other X (explain) <br /> Motor Grader (Blade) <br /> Fertilization N/A Product Used: <br /> Rate: <br /> Seed Mixture(s) 2019 Refer to Table(s) Range Site AB; Aerial <br /> Drill seeded in Fall 2019; Aerial seeded in <br /> Spring 2020. <br /> Bond Release Phase I Phase II Phase III <br /> Application # SL-21 <br /> Approval Date <br /> Comments: DRMS topsoil depth sampling verified with inspection report of October 2019. <br /> MARECLMHS <br />