My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-05_PERMIT FILE - M2020008
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020008
>
2020-08-05_PERMIT FILE - M2020008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2025 7:05:04 AM
Creation date
8/6/2020 8:50:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020008
IBM Index Class Name
Permit File
Doc Date
8/5/2020
Doc Name
Adequacy Review Response
From
Scott Contracting
To
DRMS
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m(17) CONa,F. rION SITE ASSESSMENT:—OFF SITE POLLUTANT DISCHARGES AR.* ,iATION OF THE PERMIT AND REASON FOR IMMEDIATE PROJECT SUSPEtv.,.( <br /> (a)Is there evidence of discharge of sediment or other pollutants from the site? El Yes O No <br /> If yes,explain the discharge and the corrective actions in section 16(Construction Site Assessment&Corrective Actions)or section 18(General Notes). <br /> (b)Has sediment or other pollutants discharging from the site reached state waters? Cl Yes 0 No <br /> 'If yes,see subsection 208.03(c)and Part II A2 and 3 of the permit for reporting requirements. <br /> (18)GENERAL NOTES <br /> (19)INSPECTION CERTIFICATION <br /> I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure <br /> that qualified personnel properly gather and evaluate the information submitted.Based on my inquiry of the person or persons who manage the system,or those <br /> persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am <br /> aware that there are significant penalties for submitting false information,including the possibility of fine and imprisonment for knowing violations. <br /> Contractors Erosion Control Supervisor/SWMP Administrator(Signature Required) Date: <br /> CDOT Project Engineer/CDOT Designee(Signature Required) Date: <br /> (20)COMPLIANCE CERTIFICATION <br /> c Corrective action(s)has been taken,or where a report does not identify any incidents requiring corrective action,the report shall contain a signed statement <br /> ° indicating the site is in compliance with the permit to the best of the signer's knowledge and belief. <br /> T <br /> O <br /> 3 Contractor's Erosion Control Supervisor/SWMP Administrator(Signature Required) Date: <br /> a <br /> J <br /> w CDOT Project Engineer/CDOT Designee(Signature Required) Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.