Laserfiche WebLink
VII. Conclusion <br /> The information above is designed to outline the sampling procedures and processes to evaluate the <br /> groundwater quality at the CSQ Marble Quarry and the subsurface hydrocarbon contamination associated with <br /> the diesel release. <br /> As outlined in this Plan,monthly sampling of the sump groundwater monitoring well is planned for a 12-month <br /> period (January—December 2020)with the three(3)additional groundwater wells being sampled monthly for <br /> the remainder of 2020 once they are installed and developed. <br /> A summary of the groundwater data will be compiled into an annual report. In the event the timeline of sampling <br /> and monitoring is materially revised as a results of data results obtained throughout 2020 or for other reasons, <br /> the DRMS (and other regulatory agencies, as applicable)will be so advised. <br /> If changes occur to the site and project, alterations to this plan may be required. This document is intended to <br /> be a living document and any revisions will be noted on the cover page with the revision date and provided to <br /> the DRMS (and other regulatory agencies, as applicable) for approval. <br /> 6 <br />