Laserfiche WebLink
3. Describe the estimated topsoil depth and how topsoil will be salvaged,stockpiled and <br /> redistributed for the re-establishment of vegetation Specify approximate topsoil <br /> redistribution depth: <br /> Topsoil is from 0-2 inches, with most of it in the draws, No holes are <br /> planned in any draw. if iMcoUntereditWill be stockpiled and then <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): <br /> Bottom of hole to 7 m below surface will be filled with bentonite <br /> triencemented to surTrace <br /> 5. Describe how portals, adits,shafts,ponds,excavations, or other disturbances will be <br /> reclaimed(refer to Rule 3 and Rule 5 for specific reclamation performance standards). <br /> You may wish to contact the Division for closure specifications. <br /> All cutting will be refilled with excavated materials. <br /> any disturbance will be re-contoured. <br /> Form 1—DRMS Use and Con iden"Ffle Page 9 of 14 <br />