Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Ncraper I rusn mozer I source <br />Altitude Adi: 1 1.000 1 NA I (CAT HB) <br />Net Correction: 1 0.830 NA <br />Travel Time: <br />Road Condition: Hard, smooth. stabilized. surfaced watered maintained 2.0 <br />Hanl Rrmite- <br />Page 16 of 115 <br />Site Altitude: 7500 feet <br />Seg # Haul Distance (Ft) Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />1 <br />Velocity <br />(fpm) <br />1 <br />Travel Time <br />(min) <br />1 2000.00 2.00 <br />2.00 <br />4.00 <br />2394 <br />1.06 <br />HaulTime: 1.06 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) Grade <br />%) <br />Roll. Res <br />%) <br />Total Res Velocity Trawl Time <br />(%) ROm (min) <br />1 1 <br />1 <br />2000.00 -2.00 <br />2.00 <br />0.00 2965 0.78 <br />Return Time: 0.78 minutes <br />Total Scraper teamcycle time: 3.44 minutes <br />Adjusted forjob conditions: 839.65 LCY/Hour <br />Selected Numberof Scrapers: 2 Scraper(s) <br />Adjustedsingle scraper team(unit) hourly production: 839.65 LCY/Hour <br />Adjustedmultiple scraper team (fleet) hourly production: 3,358.60 LCY/Hour <br />Unadjustedunitproduction/hour: 1,011.63 LCY/Hour <br />Optimal Numberof Scrapers perpush dozer: <br />JOB TIME AND COST <br />Fleet size: 4 Team(s) <br />Unitcost: $1.343 /LCY <br />Total job time: 12.66 Hours <br />Totaljob cost: $57,115 <br />CIRCES Cost Estimatmg SoSware <br />