Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />cr <br />1_00 Minutes <br />0.60 Minutes <br />I Job Efficiencv: 1 0.830 1 NA I (CAT HB) <br />Net Correction: I 0.830 I NA I <br />Travel Time: <br />Road Condition: Hard, smooth, stabilized. surfaced watered, maintained 2.0 <br />HaulRoute: <br />Page 10 of 115 <br />Site Altitude: 7500 feet <br />Seg # <br />Haul Distance (Ft) Grade <br />(%) <br />Roll. Res <br />(%) <br />1 <br />Total Res <br />(%) <br />1 <br />Velocity <br />(fPM) <br />1 <br />Trawl Time <br />(min) <br />1 <br />1045.00 2.00 <br />2.00 <br />4.00 <br />2394 <br />0.67 <br />HaulTime: 0.67 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />1 <br />Velocity <br />(pm) <br />1 <br />Trawl Time <br />(min) <br />1 <br />1 <br />1045.00 <br />-2.00 <br />2.00 <br />0.00 <br />2965 <br />0.46 <br />Return Time: <br />0.46 <br />minutes <br />Total Scraper teamcycle time: <br />2.73 <br />minutes <br />Adjusted forjob conditions: <br />1,058.02 <br />LCY/Hour <br />Selected Numberof Scrapers: <br />2 <br />Scraper(s) <br />Adjusted s ingle scraper team (unit) hourly production: <br />1,058.02 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />4,232.09 <br />LCY/Hour <br />Unadjus tedunit production/hour: 1,274.73 LCY/Hour <br />Optimal Numberof Scrapers perpush dozer: <br />JOB TIME AND COST <br />Fleet size: 4 Team(s) <br />Unitcost: $1.066 /LCY <br />Total job time: 93.23 Hours <br />Totaljob cost: $420,641 <br />CIRCES Cost Estimating Sodware <br />