My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-18_PERMIT FILE - C1981019A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2020-05-18_PERMIT FILE - C1981019A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2020 5:28:39 PM
Creation date
8/4/2020 2:06:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
5/18/2020
Doc Name
Cumulative Bond Schedule
Type & Sequence
MR215
Section_Exhibit Name
Volume 20 Exhibit 13C
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 of 115 <br />Total Cost <br />Subtotal (adjusted for <br />Job Hours: 60.00 (unadjusted): $266,395.52 location): $254,407.72 <br />CIRCES Cost Estimating Software <br />in. to 24 in. thick - <br />No reinforcing <br />Demo Facilities <br />N/A <br />Floor, concrete, <br />7,750.00 <br />SF <br />$1.34 <br />$10,385.00 <br />Concrete <br />demolition only, 6 <br />in. thick- No <br />reinforcing <br />Demo HaulRoad <br />48' x 24' x <br />Bldg. (MN) <br />196,337.00 <br />CF <br />$0.23 <br />$44,372.16 <br />Crossing (circular <br />217' <br />demo./on-site <br />area) <br />disposalin <br />excavated pit - <br />Max 10,000 ft. haul <br />Electrical <br />80' x 80' x <br />Bldg. (SN) <br />76, .00 <br />CF <br />$0.19 <br />$14,208.00 <br />Substation <br />12' <br />demo./on-site <br />disposalin existing <br />pit or cut - Max <br />10,000 ft. haul <br />Primary Crusher <br />420' <br />OBSOLETE- <br />420.00 <br />LF <br />$53.42 <br />$22,436.40 <br />(Task#517) <br />Conveyor, elevated, <br />including supports - <br />8ft.Wx10ft.H <br />housing <br />Pump Building <br />6'x 8'x 18" <br />Demo. and on-site <br />48.00 <br />SF <br />$1.19 <br />$57.26 <br />Vault <br />disposal in existing <br />pit, 12 in. thick - <br />Max 50 ft. push <br />Raw Water Pump <br />20' x 32' x <br />Bldg. (SN) <br />13,440.00 <br />CF <br />$0.19 <br />$2,486.40 <br />Building <br />14' <br />demo./on-site <br />disposalin existing <br />pit or cut - Max <br />10,000 ft. haul <br />Remove Elevated <br />1.5' x 2' <br />Footing, concrete, <br />16.00 <br />LF <br />$3.54 <br />$56.64 <br />Pipe Footers <br />average reinforcing <br />-1.5ft. x2ft. <br />Remove Taylor <br />150' <br />Pipe, steel, welded <br />150.00 <br />LF <br />$6.56 <br />$984.00 <br />Creek Elevated <br />connections -10 in. <br />Pipe <br />diameter i e <br />Water Tank <br />35' dia <br />Bldg. (MN) <br />279,941.00 <br />CF <br />$0.21 <br />$59,067.55 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max <br />10,000 ft. haul <br />Total Cost <br />Subtotal (adjusted for <br />Job Hours: 60.00 (unadjusted): $266,395.52 location): $254,407.72 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.