Laserfiche WebLink
21 July 2020 C-1994-082/Seneca II W Mine RAR <br />Page 5 of 11 <br />Map III: Phase II III SL6 parcels are shown in orange, Phase II SL 6 parcels in <br />dark green and phase III A7 parcels are shown in light green. <br />Parcels requested for <br />released are located as <br />shown on the map at left. <br />Both private and Federal <br />surface areas are included <br />in the proposed release. All <br />parcels have previously <br />been phase I released. <br />HYDROLOGIC BALANCE <br />-Rule 4.05 <br />Drainage Control4.05.1, <br />4.05.2, 4.05.3; Siltation <br />Structures 4.05.5, 4.05.6; <br />Discharge Structures <br />4.05.7, 4.05.10; Diversions <br />4.05.4; Effluent Limits <br />4.05.2; Ground Water <br />Monitoring 4.05.13; <br />Surface Water Monitoring <br />4.05.13; Drainage -Acid <br />and Toxic Materials 4.05.8; <br />Impoundments 4.05.6, <br />4.05.9; Stream Buffer <br />Zones 4.05.18: <br />Unless otherwise noted <br />pond banks, dams and <br />reconstructed drainage <br />ways appeared stable, <br />functioning adequately and <br />appeared well vegetated at <br />the time inspection. <br />o Pond 5 was not discharging at the time of inspection although the spring below was discharging. <br />Pond banks and dam outslope appeared stable at the time of inspection. <br />o Pond 6 held water at the time of inspection. <br />o Pond 16 was receiving inflow from the spring fed system above and was discharging at the time <br />of inspection. No seepage was evident at the dam outslope and pond banks appeared stable with. <br />Large carp were observed in the pond. <br />o Stock Tanks T5 and T6 (parcel 22) were holding water at the time of inspection. <br />o Stock Tank T26 held water at the time of inspection and was not discharging. <br />o Stock Tank T27 (parcel 154), held water and was not discharging at the time of inspection. <br />Surge tanks above were dry. <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 0 <br />