EXHIBIT E <br /> RECLAMATION PLAN <br /> Materials Handling <br /> Accessible final topography will be graded with properly equipment; back fill with overburden <br /> lower three benches (1-6730 to L6790); back fill L6730 will start by 2025 and will end L6790 <br /> by 2032, overburden will be hauled and dumped per benches, a dozer will push berms and <br /> compact it from south to north as mining sequence is executed. Exhibit F, shows crest and <br /> toes by lower three benches. <br /> North East wall (region 1 - Upper) per geotechnical assessment will have bench slope at <br /> 650, 20ft berms and 30ft high safety wise and such as control erosion. Push back is planned <br /> by 2021 through 2023; concurrent reclamation on this area should start by 2024 or 2025. <br /> Titanium Hill should start to produce by 2023, after initial pre mining stage is performed <br /> removing overburden at the top of the hill. <br /> Water <br /> Due to lack of surface water on the affected land or in close proximity to the affected land, <br /> deep water table, and high permeability of soils and mine spoils, mining will have no <br /> measurable effect on the water resources of the surrounding areas. <br /> Wildlife <br /> In consultation with the local wildlife office, a goal of the reclamation plan will be to involve <br /> improvement of wildlife habitat. <br /> Topsoiling and Revegetation <br /> Topsoil stockpiles are stored to minimize erosion; within our actual permit there is not much <br /> room to execute concurrent reclamation; overburden and mining areas are active. We will <br /> contact Natural Resource Conservation Service to update seed mix and planting rates <br />