My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-29_GENERAL DOCUMENTS - C1984065
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1984065
>
2020-07-29_GENERAL DOCUMENTS - C1984065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2020 1:58:01 PM
Creation date
7/29/2020 1:47:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
General Documents
Doc Date
7/29/2020
Doc Name Note
For SL3
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
C.B. Minerals Company, LLC
Permit Index Doc Type
Findings
Email Name
JDM
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. The reclamation supports the approved post -mining land use (Rule 4.16.1); <br />6. Sample adequacy and revegetation success for cover and productivity shall be made with <br />one of the following statistically valid approaches in Rule 4.15.11(2)(a), (b), or (c). <br />Demonstrations of sample adequacy and revegetation success for woody plant density shall <br />be made with one of the following statistically valid approaches in (a), (b), or (c), or with <br />one of the alternative approaches specified in 4.15.11(3); and <br />7. All areas requested for Phase III bond release meet the requirements for Phase I and Phase II <br />bond release or have previously received Phase I and Phase II bond release approval. <br />Coal Ridge provided vegetation monitoring reports for the Phase III Bond Release area in the <br />SL -03 application. <br />IV. OBSERVATIONS AND FINDINGS <br />The following discussion of observations and findings focuses on the results of vegetation re- <br />establishment and compliance with the reclamation plan for the Coal Ridge No 1. Mine for Phase <br />III Bond Release. Reclamation was initiated in 1994 for the majority of the site with the sediment <br />control structures reclaimed during the fall of 2015. Vegetation sampling was conducted in 2018 <br />and 2019. The area requested under the Coal Ridge SL -03 application have met or surpassed the <br />minimum lability time frame of ten years in accordance with Rule 3.02.3(2)(b). <br />The evaluation of the bond release application included a review of past inspection reports, annual <br />reclamation reports, and annual hydrology reports, as well as a pre -inspection meeting to discuss <br />permit requirements and regulatory criteria and the bond release inspection. The bond release <br />inspection was conducted on June 3, 2020. Revegetation success data that was included in the bond <br />release application was reviewed by the Division in the office during the technical evaluation of the <br />bond release application before, during and after the inspection. <br />During the Phase III Bond Release inspection, participants walked through each of the bond <br />release request parcels to allow for visual assessment of compliance with pertinent requirements <br />as described above in Section III of this document. A summary of the observations are discussed <br />below and the details are further discussed in the associated inspection report. <br />Phase III <br />Coal Ridge is approved for Dry Land Pasture and Wildlife Habitat (Sagebrush Revegetation) post - <br />mining land use as shown on Figure 1 of this document. Based on the 2018 and 2019 vegetation <br />sampling results for Phase III Bond Release, the Division finds that Coal Ridge has achieved <br />adequate cover, productivity and diversity in the SL -03 application area in conjunction with the <br />approved post -mining land use. These results are summarized below. <br />Phase III Bond Release Vegetation Results — Dry Land Pasture <br />2018 Cover: Herbaceous cover: 51.5% <br />Proposed Decision and Findings of Compliance July 2020 <br />Phase III Bond Release SL -03 Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.