My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-29_GENERAL DOCUMENTS - C1984065
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1984065
>
2020-07-29_GENERAL DOCUMENTS - C1984065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2020 1:58:01 PM
Creation date
7/29/2020 1:47:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
General Documents
Doc Date
7/29/2020
Doc Name Note
For SL3
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
C.B. Minerals Company, LLC
Permit Index Doc Type
Findings
Email Name
JDM
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Garfield County, Colorado in portions of Township 6 South, Range 90 West (6th Principal <br />Meridian), Sections 6. The permit area can be found on the USGS Quadrangle 7.5 Minute Series <br />Maps of New Castle and Storm King Mountain. The permit area and surface ownership can be <br />found on Map 1, and the coal ownership can be found on Map 2 of the Permit Application <br />Package (PAP). <br />Background <br />Coal Ridge was developed as a room and pillar operation utilizing hydraulic mining techniques <br />which use high pressured jets of water for cutting and breaking coal for extraction. Entries <br />within the coal seam were designed to move upslope so that gravity would have caused the slurry <br />of coal and water to flow from the mining section to the portal. Coal was to be transported by a <br />water flume to a preparation facility where it would be dewatered and stored for shipment. <br />Development operations commenced in October 1986. Two portals were driven by a roadheader <br />approximately 500 feet into the hillside. Coal Seams were not reached, hydraulic mining never <br />began, and coal was not produced. Development operations discontinued in March 1987. The <br />decision was made in 1993 to reclaim the site, and reclamation operations were initiated in 1994. <br />Reclamation for Coal Ridge involved sealing, backfilling, and regrading the portal areas to blend <br />in with the pre-existing topography. A concrete wall section was built across the portals which <br />were covered by 25 feet of backfill. Facilities were demolished and backfill and grading <br />activities were accomplished. Disturbed areas were topsoiled and seeded in compliance with <br />final reclamation specifications. The sediment control structures were the last features to be <br />reclaimed at Coal Ridge during the fall of 2015. The features reclaimed were Sediment Pond A, <br />the concrete splitter box and Culvert 5 at the inlet to the pond, and the Small Area Exemption <br />ditches, berms and sump. <br />Permit, Performance Bond, and Bond Release History <br />The Coal Ridge No. 1 Mine was issued on October 9, 1985 and renewed on December 10, 1989, <br />January 30, 1993, February 28, 1997, September 21, 2001, October 16, 2006, December 20, <br />2011, and January 10, 2017. The Division currently holds a reclamation bond in the amount of <br />$43,200.00. <br />Coal Ridge has applied for two previous bond releases. In October 19, 1995, a partial Phase I <br />Bond Release (SL -01) recognized accomplished reclamation work. A partial Phase I and 11 <br />Bond Release (SL -02) for the remaining areas of the site was approved on August 17, 2001. <br />SL -03 Phase III Bond Release and Termination of Jurisdiction Application <br />The Coal Ridge SL -03 application was received by the Division on March 23, 2020 and originally <br />deemed incomplete for the purpose of filing on May 7, 2020 for not including the vegetation reports <br />for the Division's review to ensure all applicable Rules and site standards have been satisfied. The <br />Proposed Decision and Findings of Compliance July 2020 <br />Phase III Bond Release SL -03 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.