Laserfiche WebLink
Injection Pump <br /> pH Adjustment line <br /> Canister Filter 1 <br /> pH Adjustment Tank Canister Filter 2 <br /> NaOH <br /> Injection Pump <br /> ( RO 2 RO 1 <br /> I Anti—Scalant <br /> — _ Injection Line <br /> Treated Water Discharge <br /> Discharge to Creek <br /> DIS001A I <br /> - - <br /> STAMP/SEAL <br /> Treated Water Holding Tank IX Vessel 3 IX Vessel 2 IX Vessel 1 RO Process Permeate <br /> RO Anti—Scalant <br /> RO Process Concentrate <br /> RO Feed Water <br /> In—Situ Treatment Injection Line <br /> Back Fill Slurry Line <br /> 410 ft.f Mine Pool REVISION HISTORY <br /> Submersible Pump <br /> 400 ft. <br /> 1 1100 ft. A As Built Revision 2/10/20 TF <br /> Back Fill Slurry pump REV ISSUE/REVISION DATE APP <br /> Mine Pool at Mine Shaft 2 <br /> Mine Pool at Jeffery's Shaft , <br /> -- ENSERO <br /> s o l u t i o n s <br /> Storage Tank 2 This drawing has been prepared for the use of Alexco <br /> 9 Storage Tank 1 Environmental Group's client and may not be used, reproduced <br /> or relied upon by third parties, except as agreed by Alexco <br /> Environmental Group and its client, as required by law for use <br /> of governmental reviewing agencies. Alexco Environmental Group <br /> accepts no responsibility, and denies any liability whatsoever, to <br /> Barium Chloride any party that modifies this drawing without Alexco <br /> Injection Pump Injection Line Environmental Group's express written consent. <br /> PROJECT DESIGNED DRAWN DATE <br /> Sump Recovery Line NO. BY BY <br /> CLL-2020 TF NL 2/10/20 <br /> Schwartzwolder WTP Existing Conditions <br /> Sump Recovery <br /> Barium Chloride Tank Booster Pump <br /> Sump Recovery Tank Figure E— <br /> Process Flow Diagram <br /> Mine Raw Feed <br /> DRAWING REVISION <br /> No. CLL-2020—D604 I A <br />