Laserfiche WebLink
-4- <br /> 12. Primary future(Post-mining)land u check one): <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primarlpresent land use check one : <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Bulldoze soils and overburden to stockpile areas prior to gravel extraction with front end loader. <br /> 15. On Site Processing: Z Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.tiuck/shovel): <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> none <br /> 16. Description of.Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> No change in mining method from past twenty vears of operation Annual production volume is <br /> processed over 2-3 months each year by an outside crushing contractor. A four phase mining <br /> plan is prepesed fer the 40 added aeres of gravel reserve te be mined ever the next twenty <br /> years. <br />