The existing 22 foot wide gravel road from north end main gate to central location of the scale house <br /> will remain for the life of the mine. Truck loading operations will continue near to product stockpiles <br /> located adjacent to portable crushing and screening plants set up as close as reasonably possible to the <br /> exposed gravel bank. Overtime,the stockpile/truck loadout areas will migrate east and south with <br /> front end loader and truck access as well as surface drainage maintained by grading and gravel <br /> placement to minimize mud conditions during times of wet weather. During later stages of mining <br /> (Phases 3&4),the scale may be re-located to the amended acreage area to get closer to stockpiles and <br /> truck loading area. At that time, a gravel roadway 22 feet wide and minimum 6"depth will connect the <br /> existing roadway with new scale location likely to be sited in the central portion of Phase 2 area. All <br /> road graveling will be placed to not restrict the primary drainage plan of surface flows to the west and <br /> south towards the sediment control pond located in the south end of the property. <br /> Mining Equipment List <br /> Front End Loaders--2 at the pit at all times, 2 additional during crushing operations <br /> Bulldozer <br /> Water Truck and/or Water Tank for road application as needed <br /> Motor Grader as needed for road maintenance <br /> Crushing and Screening Plant—Portable Primary Crusher, Secondary Crusher,Screen Decks, Stacking <br /> Conveyors—in use app. 3 months per year, owned and operated by outside contractor. <br /> Skid Steer Loader for clean up <br /> Pick-up Trucks <br /> Portable Scale <br />