My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-24_REVISION - C2010088
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010088
>
2020-07-24_REVISION - C2010088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 1:23:13 PM
Creation date
7/27/2020 10:31:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
Revision
Doc Date
7/24/2020
Doc Name Note
Application Cover Letter & Revised Pages
Doc Name
Proposed Revision Materials
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
MR10
Email Name
CCW
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />APPLICATION FORM FOR A REVISION <br />TO A COAL MINING AND RECLAMATION PERMIT <br />This form must be completed and submitted with all r equests for minor revisions, as defined in Rule 1.04(73), <br />technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90). All revisions <br />are to address the requirements of Ru le 2.08.4. Three (3) copies of the revision, including maps, must be <br />submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and/or figures, with a revised table of contents, if necessary. The revision submittal date should be printed <br />in the lower right corner of each revision page. A cove r letter to the revision should explain the nature of the <br />revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application mu st be submitted to all agencies on the federal mailing list <br />(except OSM) at the same time the application is sub mitted to the Division, and pr oof of distribution must be <br />submitted to the Division along with the application. C opies of revision pages modified during the review process <br />must be distributed in the same manner, along with proof of distribution. Pr oof of distribution must be submitted <br />prior to implementation of the revision. <br />Permit No.: C_ 2010 - 088 Date: 07 /16 / 2020 <br />Permittee: CAM -Colorado, LLC <br />Fruita Loadout <br />Street: 2352 N 7th Street, Unit B <br />City: Grand Junction <br />State: CO Zip Code: 81501 _ <br />Brief Description of Revision: Update identification of interests. <br />Public Notice Attached: Yes❑ No F✓ (Required for PRs and TRs) <br />Bond Increase: Yes❑ No F/ Federal ® Non -Federal ®✓ Mine <br />Proposed Change in: <br />Permit Area - <br />Disturbed (+/-) _ _ _ _ Acres <br />Permit (+/-) _ _ _ _ Acres <br />Affected (+/-) _ _ _ _ Acres <br />Mineral Ownership - <br />Mineral Private (+/-) _ _ _ _Acres <br />Mineral Federal (+/-) _ _ _ _ Acres <br />Surface Ownership - <br />Private Land (+/-) _ _ _ _ Acres <br />Federal Land (+/-) _ _ _ —Acres <br />State Land (+/-) _ _ _ _ Acres <br />Mineral State (+/-) _ _ _ _ Acres <br />
The URL can be used to link to this page
Your browser does not support the video tag.