My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-24_PERMIT FILE - M2020032
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020032
>
2020-07-24_PERMIT FILE - M2020032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 10:46:04 PM
Creation date
7/27/2020 10:22:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020032
IBM Index Class Name
PERMIT FILE
Doc Date
7/24/2020
Doc Name
Adequacy Review Response
From
Environment, Inc.
To
DRMS
Email Name
DC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION PLAN EXHIBIT D <br /> 6.3 .4 - Final grading will be such that the topography is <br /> appropriate to the reclaimed use of the property, i.e. , as a private <br /> home site. The east slope left when material removal ends will be <br /> graded 3h to lv and the floor of the mine will be flat and daylight <br /> out along the south, west and north sides . The RECLAMATION PLAN MAP- <br /> ExHIBIT E-2 shows how we think the area will look when it is reclaimed. <br /> Reclamation will begin once the final floor level has been <br /> reached. The disturbed area will be shaped to match the final <br /> configuration needed to shape the building envelope area, the stock <br /> piles of topsoil will be spread on the east slope an average of 8 <br /> inches and the large stockpiles of dirty sand and dirt will be spread <br /> evenly over the gravel floor (-14" deep) . The Development area will <br /> not be resoiled until construction ends . However, it will be tempo- <br /> rarily seeded if development does not begin before seeding is re- <br /> quired. If the revegetation areas are ready after the ideal planting <br /> time seeding will be done the first growing season after recoiling <br /> was completed. Actual construction and placement of the Development <br /> structure and features is not part of this Reclamation Plan as it <br /> will be controlled by Grand County under their development guide- <br /> lines . The new private drive will be graded in from the southeast <br /> corner to the development floor but this road will remain after <br /> reclamation is complete to provide access to the owner. The tempo- <br /> rary road entering the west side will be removed during reclamation. <br /> Fertilizer will be used to enhance the seed growth and will be <br /> spread using a tractor pulled rotary spreader, on the seedbed and <br /> disced in during seedbed preparation. <br /> Seeding will occur between September 15th and May 31st. Gener- <br /> ally before the first freeze in the fall or after the last freeze in <br /> the spring. The seed will be drilled to insure maximum germination <br /> and most rapid cover establishment . The seeding mix and species of <br /> grasses to be used on the area are shown on page 18 of this report . <br /> The seed will be obtained from a supplier in the area so the mix is <br /> adapted to local conditions. Only inaccessible areas (if any) will <br /> be broadcast seeded. If the seed is broadcast, the seed rates will <br /> be doubled. The seeded area will then be mulched using 2000 lbs/acr- <br /> es of clean straw and crimped onto the seed bed. <br /> After the second growing season the site will be inspected and <br /> an assessment of revegetation success will be done to determine if <br /> additional seeding will be necessary. If the analysis shows addi- <br /> tional work is needed it will be done that fall . <br /> Weed control will be implemented prior to and during <br /> revegetation activities . This does not mean we will attempt to kill <br /> all weeds, since some provide a natural ground cover and shade for <br /> emerging grass . We will concentrate on controlling the noxious weeds <br /> on the reclaimed area. <br /> Track 4 Grading Project July 22, 2020 <br /> 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.