Laserfiche WebLink
tered on this site . When reclamation is complete the overall <br /> grade of the disturbed area will remain sloping from south to <br /> north and east to west to preserve the natural drainage pattern. <br /> The base of the development area will be natural material that <br /> will allow stormwater to soak into the ground. Ms . Evans will <br /> commit to not mining within 2 feet or the groundwater table. <br /> The final slopes along the east side will be graded 3h to lv <br /> leaving a stable slope on that side that will prevent any off <br /> site impacts . The north, west and south sides will be daylighted <br /> out the side to match the floor of the Thompson Resources . Since <br /> no slopes will be created on these sides the excavated area will <br /> be stable and their configuration prevent off site damage . <br /> During leveling the material will be moved into the Thompson <br /> Resource in agreement with Reclamation Ridge LLC the operators on <br /> the mine. T that area is covered by a Reclamation Permit and any <br /> disturbance will be reclaimed during normal reclamation activi- <br /> ties at that mine. <br /> Grading and shaping will run concurrent with mining so that <br /> if the project ended prematurely only resoiling of the disturbed <br /> area, grading, shaping and resoiling would be needed. <br /> Of the 9 . 99 acres ± in the permit area, approximately 7 . 0 <br /> acres ± will be disturbed. The remaining 2 . 99 acres will be the <br /> undisturbed are on the north. A 10 foot setback is used on the <br /> east to maximize the amount of level area that can be developed. <br /> The material will be excavated using scrapers and if needed <br /> push dozers . All of the material will be removed as pit run with <br /> no processing taking place on the site . The RECLAMATION PLAN MAP-E-2 <br /> shows how the area will look when mining ends and reclamation is <br /> complete. <br /> On-site equipment may include, but is not limited to, motor <br /> graders, motor scrapers, dozers and a water truck. <br /> All material will be transported off site for disposal, <br /> meaning no processing will take place on the project area. We <br /> expect the grading project to last for less then 8 months weather <br /> permitting. <br /> When topsoil is encountered, it will be stripped and stock- <br /> piled around the perimeter of the site or on the floor for use in <br /> reclamation. We will place an average of eight (8) inches of <br /> salvaged topsoil on the slopes . The floor will not be topsoiled <br /> initially as it will be under development until the facility are <br /> constructed. Topsoil will be saved for the area needing <br /> resoiling after the strictures and arena is completed. If the <br /> soil stockpiles remain undisturbed for more than one growing <br /> season it will be temporarily seeded using the approved seed mix <br /> at a rate of 12 . 8 lbs-pls per acre. <br /> Track 4 Grading Project July 22,2020 <br /> C-4 <br />