Laserfiche WebLink
I <br /> 0010 <br /> uenleral, Shale <br /> Bui *I <br /> lding The American <br /> e pit south o the mine e nd. The broken,-down grog will, b Ian e h fresh, grog to <br /> minimize dust., <br /> Grog may also, be stockpiled at the south end of pits a location to dispose ofgr from <br /> brick <br /> Then when relclarnation,begins, e will place the grog into pit. We do not anticipate <br /> settling and voids due to, the Placement of gees materialsibecilause the grog witIbe placed in, . <br /> foot lifts.1, blended with thecurrient,overburden materials and compactled. `Fhe scra,p brick will be <br /> hauled starting in,August 2020. <br /> These materials will not Impact surfacetiter runoff quality, because these materialis do not <br /> contain contaminants, and, local, area storinwater runoff is, divertedaway from the mine <br /> disturbed, aye . The grog,will not contain1nate ground water because It has been, fired to a hi g . <br /> temperature. F the these materials,will not be placedbelow"the saturated, zone,. <br /> DustAbatement Pa <br /> Please see attached dustabatement plan <br /> Allowance of s a yfogsta � � l fve � n e , den s ck s <br /> GSB would, utilize grog to cover the slopes, h t u - e ue e stockPiles as an <br /> afternative to tackifi,er., This, would only be done on slopes,that face the Interior of the mine and <br /> away from the houses. <br /> Plan for Current,Overburden Stockpile' 'Topsold Stockpfle, and Associatedto ti e <br /> Ditch s . its anon and Sethi <br /> The ore , maintenance and seedingare as <br /> July or early August 2020, en mowing contractor is available, rnow the weeds on the <br /> overburden,, stockpile, topsoi.1 stockpile, and ditch area. G ttingrid of the weeds now <br /> rather than later should, help,the nati.ve vegetationestablish itself <br /> e n w w <br /> w Cover with.tacki,fier any,bare spots that are misstrig tackifierareas disturbed <br /> inowing with, tack :ll in,July or August,2020, after m w , The area north, of the white <br /> siand clay stockpile ill be covered with,tackifier'because, thisties is sliartingto grow, <br /> grass. <br /> 3 Spray magnesium chloride dust suppressant in, July or August 2020on the clay stockpile <br /> . areas. <br /> 4. Review the area in, S e llber 20,20 to determiltie what 'is needed,to continue establi,shing <br /> e grass. This could inctLide <br /> . Oversees <br /> b. Fertflizling <br /> c. Ilerblel.de applIcation. for weeds <br /> metal Shale, 1845 West Dartmouthe,Denver Colorado 80110, Page <br />