Laserfiche WebLink
pf•Cp�p� <br /> COLORADO DIVISIOPTR03 N, MINING AND SAFETY <br /> 1313 Sherman Street,Roo 3 ph(303)866-3567 <br /> ECS/mac ECE111—D <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET JUL 2 2 2020 <br /> 1981 -148 Chieftain South Mine Df��� <br /> File No.: M- Site Name: DTVISI OF R LAYATION <br /> MININGTND SAFETY <br /> County Jefferson TR# (DRMS Use only) <br /> Permittee: General Shale Brick, Inc. <br /> Operator(If Other than Permittee): <br /> Harold Stickler cn ,<\ <br /> Permittee Representative: 0 3 <br /> o <br /> o 3 tD <br /> Please provide a brief description of the proposed revision: �_ -a. co <br /> 1. Notice of backfill of inert structural fill. cv o- <br /> 2. Dust abatement plan . <br /> 3. Allowance of scrap brick for stabilization of overburden-interburden stockpiles co <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or applicatior <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submie, o <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a Tl m <br /> the Division may require the submittal of a permit amendment to make the required or desired change. IO <br /> v• 70 <br /> to the permit. il o O <br /> The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br />