Laserfiche WebLink
TABLES AND FIGURES <br /> Table 1. Summary of All Liability Releases (acres) <br /> Total Disturbed Phase I Released Phase II Released Phase III Released <br /> Permitted 4,977.60 <br /> SL-01 226.4 176.4 <br /> SL-02 712.1 <br /> SL-03 762.1 <br /> SL-04 494.2 420.9 <br /> SL-05 979.5 <br /> SL-06 692.4 <br /> SL-07 125.2 <br /> SL-08 189.6 <br /> SL-09 65.6 <br /> SL-10 202.4 <br /> SL-11 129.6 <br /> SL-12 47.5 182.5 <br /> SL-13 103.1 <br /> SL-14 822.4 222.6 <br /> SL-15 68.7 3.7 3.7 <br /> SL-16 8.5 43.7 5.2 <br /> SL-17 0.4 0.4 0.4 <br /> Totals 4,977.60 2,815.8 2,277.1 1,596.3 <br /> Proposed Decision and Findings of Compliance July 21,2020 <br /> Partial Phase I Bond Release SL-18 Page 8 <br />