My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-21_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2020-07-21_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 4:12:24 PM
Creation date
7/22/2020 4:11:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
7/21/2020
Doc Name
Proposed Decision and Findings of Compliance
Type & Sequence
SL18
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 3. SL-18 Releasable Amount <br /> Task(Phase I) Cost <br /> Doze Poly ID D-33 (Map 35A) $ 142,860.00 <br /> Doze Poly ID D-34(Map 35A) $ 50,843.00 <br /> Doze Poly ID D-35 (Map 35A) $ 103,346.00 <br /> Doze Poly ID D-36(Map 35A) $ 17,206.00 <br /> Doze Poly ID D-37(Map 35A) $ 6,764.00 <br /> Scaper Poly ID S-37(Map 35A) $ 129,123.00 <br /> Scaper Poly ID S-38(Map 35A) $ 87,935.00 <br /> Haul/Regrade Topsoil from Pile 15B to West Pit $ 54,235.00 <br /> Reseed 44.6 acres of West Pit with Grazing Land Seed Mix $ 25,161.00 <br /> Weed Control— 10%of Reseeded Areas Four Times $ 3,520.00 <br /> Subtotal of direct costs(rounded to nearest dollar) $ 620,993.00 <br /> Indirect Costs(rounded to nearest dollar) $ 119,012.00 <br /> Total Amount $ 740,005.00 <br /> 60%of Total Amount(Phase I) $ 444,003.00 <br /> Proposed Decision and Findings of Compliance July 21,2020 <br /> Partial Phase I Bond Release SL-18 Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.