My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-22_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2020-07-22_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 4:10:33 PM
Creation date
7/22/2020 1:00:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
7/22/2020
Doc Name
Application
From
Colowyo Coal Company LP
To
DRMS
Type & Sequence
SL19
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colowyo Coal Company L.P. <br /> Reclamation Annual Section Figure Map <br /> Unit Reclamation Number Number Number <br /> Report Year <br /> GF01 2016 7 - Exhibit 7 <br /> EP058 2014 11 11-5 Exhibit 13 <br /> EP059 2016 7 - Exhibit 7 <br /> EP060 2017 6 - Exhibit 6 <br /> WP021 2015 7 7-4 Exhibit 7 <br /> WP022* 2016 - - - <br /> WP023 2016 7 - Exhibit 7 <br /> WP024 2017 6 - Exhibit 6 <br /> WP025 2017 6 - Exhibit 6 <br /> *WP022 was surface disturbance only for emergency access to a broken power pole. Topsoil was not <br /> removed nor replaced. The area was reseeded only. <br /> C. Revegetation Success Demonstration <br /> Pursuant to Rule 4.15.8(3), Phase II bond liability release will be considered acceptable if the <br /> vegetative establishment on the reclaimed land meets the requirement of 90% herbaceous cover <br /> of the reference area standard with 90% statistical confidence. Please see Appendix B for <br /> information addressing vegetation establishment and sample locations. <br /> D. Erosion Control <br /> Any rills and gullies that may occurred during the initial years of revegetation were mitigated <br /> when they occurred, and were reported in the annual rill and gully report to the Division. <br /> Successful revegetation establishment as demonstrated in this Phase II bond release application <br /> continues to assist these reclamation units to remain erosional stable. <br /> E. Sedimentology <br /> In accordance with Rule 3.03.3(b), bond liability release cannot be granted until the applicant <br /> demonstrates that the existing revegetated area will result in equivalent or lesser sediment <br /> contributions to surface runoff when compared with pre-mining levels as determined by baseline <br /> data. Please see Appendix B, which documents the sediment contributions for the areas being <br /> applied for Phase II bond release. <br /> SL-19 Phase II Bond Release Application <br />
The URL can be used to link to this page
Your browser does not support the video tag.