My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-22_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2020-07-22_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 4:10:33 PM
Creation date
7/22/2020 1:00:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
7/22/2020
Doc Name
Application
From
Colowyo Coal Company LP
To
DRMS
Type & Sequence
SL19
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 INTRODUCTION <br /> 1.1 General <br /> Cedar Creek Associates, Inc. (Cedar Creek) was contracted in 2019 by Colowyo Coal Company <br /> (Colowyo)to evaluate revegetated units for Phase II bond release at the Colowyo Mine. Data collection <br /> was performed in the interest of ascertaining progress toward revegetation success in general <br /> accordance with Rule 3.03, Release of Performance Bonds. The revegetated areas evaluated in 2019 <br /> consisted of four units within the West Pit, three units within the East Pit, and one unit within the <br /> Gossard Facility and comprises a total of 281.4 acres. At the time of sampling, revegetation within <br /> evaluated units had experienced between 2 and 4 growing seasons following completion of seeding. <br /> In addition, two reference areas (Mountain Shrub — 1980 and Sagebrush — 1981) were sampled to <br /> provide cover comparison values to facilitate an evaluation of success for the reclaimed block. The <br /> location of each unit and associated reference areas evaluated in 2019 are indicated on Map 1, sample <br /> points are presented on Maps 2-4 in Appendix A. <br /> Field sampling for the directly measurable variables of ground cover was systematically conducted <br /> within the designated units from August 19th through August 23rd, 2019. Field efforts in 2019 were <br /> conducted under the direct supervision of Cedar Creek's Senior Reclamation Ecologist and Soil <br /> Specialist, Mr. Jesse H. Dillon. Raw data tables and are presented in Appendix A. Acreages presented <br /> in this document were determined by Colowyo. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.