Laserfiche WebLink
Mr. Forrest Luke <br /> Page 7 of 7 <br /> July 2020 <br /> bond release requests. The Flume Gulch watershed includes Middle Flume and East Middle Flume <br /> Gulches. The parameters utilized in both USLE equation and the SEDCAD modelling reasonably <br /> represent the conditions in the field for pre and post mining conditions and are consistent with values <br /> utilized in TMI's permit. <br /> The requirements of the above rule are adequately met. <br /> Maps Reviewed <br /> Map ADQ Notes ADQ <br /> M3 Pre Mine Too ADQ M13A 1Facilities ADQ <br /> M4 Life of Mine Plan ADQ M13B Office, and Shop ADQ <br /> M6 Bond Worst Case ADQ M13C Ready Line ADQ <br /> M9 Haul Roads ADQ M14A Ash Pit ADQ <br /> M10A Mining and Re grade ADQ M31 Water Rights ADQ <br /> M10B Topsoil and Strip ADQ M47A Utility Waste ADQ <br /> M12 1, 2, 3 Post Mining ADQ M51 Drainage and Sed ADQ <br /> Too Control <br />