My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-17_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2020-07-17_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:34:48 PM
Creation date
7/20/2020 2:07:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
7/17/2020
Doc Name Note
Reclamation Cost Estimate
Doc Name
Adequacy Review #2
From
DRMS
To
Trapper Mining, Inc.
Type & Sequence
PR9
Email Name
RAR
JLE
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 26 of 245 <br /> BULLDOZER WORK <br /> Task description: Regrade N Pit Roads(old LOM,cross-over,ash pit) <br /> Site: Trapper Mine Permit Action: PR9 Permit/Job#: C1981010 <br /> PROJECT IDENTIFICATION <br /> Task 4: 035 State: Colorado Abbreviation: None <br /> Date: 6/23/2020 County: Moffat Filename: CO10-035 <br /> User: TNL <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat DI IT- 11U <br /> Horsepower: 850 <br /> Blade Type: Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $300.25 NA <br /> Operating Cost/Hour: $250.88 100 <br /> Ripper own. $0.00 NA <br /> Cost/Hour: <br /> Ripper op. Cost/Hour: $0.00 10 <br /> Operator Cost/Hour: $41.30 NA <br /> Total unit Cost/Hour: $592.43 <br /> Total Fleet Cost/Hour: $2,369.72 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 105,283 <br /> Swell factor: 1.150 <br /> Loose volume: 121,075 LCY <br /> Source of estimated volume: Table A-6.1 <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 100 feet <br /> Unadjusted hourly 2,870.3 LCY/hr <br /> production: <br /> Materials consistency Compacted fill or embankment 0.9 <br /> description: <br /> Average push 0% <br /> gradient: <br /> Average site altitude: 6,600 feet <br /> Material weight: 2,475 lbs/LCY <br /> Weight description: User Provided <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.